![]() |
menu powered by Milonic
|
![]() |
log in |
You are here: | Comments and remarks to Wim Jonker Klunne |
Hydro Consult (P) Ltd
PO Box 12268 Ekantakuna Kathmandu Nepal |
|
|||||||||||||||||||
Company description |
Hydro Consult is a consulting firm involved in the field of hydropower development, rural electrification, environmental studies, infrastructure development etc. People, Energy and Environmental Development Association (PEEDA - an NGO) is the sole shareholder of Hydro Consult. Hydro Consult is dedicated to providing a high quality engineering service. |
Products |
Contract Documents |
Hydro Consult prepared the contract documents for the Lower Indrawati 4.5MW hydropower project. |
Social surveys and perfor |
Hydro Consult undertook several surveys on the impact of Jhimruk 12MW hydropower project services to the most affected community. |
Layout design |
Hydro Consult undertook the layout design for hydropower including headworks, diversion weir, intake structure, desilting basin, waterway, forebay, poerhouse and tailrace. |
(Information source: registration form submitted 2003-12-01)
|